久久熟妇,亚洲AV无码国产精品草莓在线,成全视频在线观看免费高清,九九久久久66

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

沼氣凈化脫硫裝置的運(yùn)行維護(hù)!

沼氣凈化裝置的運(yùn)行維護(hù)應(yīng)符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應(yīng)定期排出脫水、脫硫裝置中的領(lǐng)凝水。當(dāng)室外溫度接近0℃時,應(yīng)每天排除冷凝水,排水時應(yīng)防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動運(yùn)行正常后,應(yīng)定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應(yīng)滿足后端工藝要求。當(dāng)發(fā)現(xiàn)脫硫效率明顯下降時,應(yīng)及時補(bǔ)充循環(huán)營養(yǎng)液。塔內(nèi)填料應(yīng)6-12個月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應(yīng)定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當(dāng)達(dá)不到設(shè)計要求時應(yīng)更換脫硫劑或進(jìn)行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應(yīng)符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當(dāng)采用塔內(nèi)脫硫劑再生時,應(yīng)關(guān)閉沼氣進(jìn)出口閥,打開旁通管道和放散管路閥門。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當(dāng)采用在線脫硫劑再生時,應(yīng)根據(jù)沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內(nèi)溫度應(yīng)低于70℃,脫硫塔出口處沼氣中氧含量應(yīng)小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進(jìn)行2次~3次再生后應(yīng)及時更換,更換脫硫劑時操作人員應(yīng)戴防毒面具,室內(nèi)應(yīng)進(jìn)行通風(fēng);
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應(yīng)符合環(huán)境保護(hù)的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
久久精品一区二区三区浪潮TV| 五月| 先锋在线资源| 安眠药扒开女同学双腿玩弄| 中文字幕在线免费| 81精品人妻一区二区三区蜜桃 | 欧美综合精品一区| 国产色在线| 99精品久久99久久久久| 久有精品视频| 日韩精品毛片一区二区| 九色不卡| 亚洲一级准交视频| 咸丰县| 香港三级日本三级A视频 | 亚洲av吞精久久久久| 亚洲乱人伦精品图片| 欧美ab| babsexxx.xxx| 四虎视频在线精品免费网址| 久久综合都市| 性一交一乱一伧国产女士spa| 亚洲愉拍99热成人精品| 亚洲欧洲免费在线| 国产AV综合AⅤ国产精品| 亚洲国产精品VA在看黑人| 亚洲AⅤ天堂网百度| 国外黄片| 最新AV网站黄色大全| 免费乱码人妻系列无码专区| 精品自拍第一页| 千部国产一区二区三区| 亚洲色欲久久久久综合网| 日韩中文字幕日韩| 久久久中文字幕亚洲一区二区| 91麻豆视频| 精品国产一区二区三区国产区| mitaojiujiu| 国产成人无码插舔爽啊啊啊啊| 狠狠干狠狠插| 涩 a v|